Cut the end so that a cross tee route hole is located the border distance in from the end wall insert a hanger wire into a hanger wire hole near the other end of the main beam.
Armstrong suspended ceiling installation guide.
Quickhang installation kits take things a step further and provide all the hooks brackets and nails plus all the ceiling grid and wall molding you ll need to cover approximately 64 sq.
Cut the top of the grid first with tin snips and then.
Three easy steps to install your armstrong ceiling a b c 1.
Suspended ceiling for 2 x 4 ceiling panels.
1 draw the room to scale.
Pdf installation instructions acoustaffix surface mount ceiling panels 900k.
How to install your armstrong suspended ceiling install grid prepare and hang main beams to prepare the first main beam trim the end of the main beam so that a cross tee slot on the main beam is the border panel distance from the wall b.
Ceiling installation decorative ceiling or wall installation doesn t have to be daunting.
Ceiling panels are sold separately these convenient kits make installing a drop ceiling an easy diy project.
Pdf installation instructions 15 16 and 9 16 grid 719k.
Pdf installation instructions 12 x 12 260k.
Pdf installation instructions 480 plank 225k.
Continue to insert all other.
Install the first main beam install the first section of main beam.
Unpack all panels at least 24 hours prior to installation.
If nailing molding directly to wall is not possible for example a.
Full length main tees bold lines are spaced 4 on center o c as measured from the center of one tee to the center of the next with 4 cross tees installed perpendicular 2 o c.
Nail wall molding to the wall studs c.
This creates the proper border tile opening tip.
Mark height desired for new ceiling a.
Snap a connecting chalk line on the 4th wall.
Panels may be stored in areas with a temperature between 60 and 80 f.
The reference ceiling level should be established by the main contractor with the help of all other services vendors.
The minimum plenum height from the ceiling slab should not be less than 100mm for lay in system.
Measuring the ceiling height is the most crucial stage before commencing installation.
Bend the wire up and wrap it around itself three times.
Add height of wall molding and mark a level line around 3 walls b.
Let your ceiling panels adjust to the environment in the room of installation.